CLIENT
|
Gilan Regional Water Company
|
YEAR
|
2009
|
STATUS
|
Ongoing
|
Project specification:
This project is planned for supplying the required water of F4 paddy fields in the main network. It consists of construction of concrete lining channel with about 10 km length and 5.8 cubic meter per second discharge. Also the main network consists of about 82 number of technical buildings and the sub-network with about 35 km with pre-constructed channel and related technical buildings.
Earthworks volume: 70,000 square feet
Reinforcement volume: 1,000 tons
Shuttering: 70,000 square feet
Concrete: 40,000 cubic meters